Bag fulls! I am getting ready to install the hardwood floors in the "Stone" 3 story I have been working on. I have loads of regular popsicle sticks, but they just don't seem to be the right width and thickness. So off to the Dollar Giant I went and came home with 16 bags of coffee stir sticks to be on the safe side. I will be starting on the ground floor and working my way up.....but before I move to the second floor and attic, I have "THE STAIRS" (dramatic dun-dun-dun!)
I do have to figure out HOW oh HOW to put in the darn two staircases. That will be a tricky feat, as the stairs I have from main floor to 2nd are not tall enough and the existing opening to the second floor is too small. There is NO opening from 2nd to attic level and I haven't got a clue how to position them...they are also too short.
But.... I shall worry about the stairs later. Floors first.
1/8th of Room 1 is Done.....9 more rooms to go!
Thats a lot of flooring to glue down. Your stone work looks great, is it paper clay?
ReplyDeleteVictoria ♥
It's a loads of flooring, I think 8/10 of the rooms will have wood. The kitchen and bath will have tile. Thank you, the stone work is cardboard egg crate.
ReplyDeletenice :) i'm flooring too its so boring :P Linda x
ReplyDelete